684 Km Of New Roads To Be Constructed Beginning This Fiscal Year

While presenting the performance report for the fiscal year 2022–2023, UNRA Executive Director Allen Kagina stated that they have increased Uganda’s national road network by 254.5km in the financial year 2022–2023, bringing the total paved stock to 6,133km.

Uganda’s Power Generation To Rise To 50,000 MW

Prime Minister Robinah Nabbanja, who presided over the introduction of the Energy Policy, stated that Uganda, like the rest of Africa, has an abundance of evenly dispersed electricity sources.
These include fossil fuels and uranium, as well as hydropower (15,000 MW), solar (10,000 MW), geothermal (500 MW), heat (800 MW), wind (200 MW), and other sources.